
Add to Cart
Railway track inspection dedicated RGV
The railway track inspection special cart designed and produced by Ruimaike can run at a speed of up to 2 meters per second. The cart is equipped with automatic air pulling and pipe removal devices, and the cart runs between two carriages for pipe removal and collaborative operation. The entire process is automated, with fixed stops for track collaborative operation.
RGV parameters:
Rated load capacity: 500kg
Power supply method: lithium iron phosphate battery power supply
Control mode: manual wireless remote control operation, automatic intelligent online control
Safety protection: laser obstacle avoidance, safe edge touching, emergency stop switch